Validation Checklist Further Changes
Overview
The South Ribble Validation Checklist was subject to a 6 week period of consultation in 2020. A Responses Report and Consultation Statement were published in Autumn 2020. As part of this publication, there were significant changes requested by the LLFA in relation to the following requirements of the checklist:
- Site Specific Flood Risk Assessment (FRA)
- Sustainable Drainage
- Sustainable Drainage Systems (SuDS) Strategy & SuDS Pro-forma
In order to ensure transparency, these changes will now be subject to a 4 week consultation period.
The relevant sections of the document can be found below.
Should you have any comments, please email Rachel.peckham@southribble.gov.uk by 5pm on 26 March 2021.
Interests
- South Ribble
Share
Share on Twitter Share on Facebook